Hawthorne Drive Preliminary Plans

Here are the latest plans for the stormwater improvements in Culbertson Run Development along Hawthorne Drive. The design is about 90% complete.

There are fewer trees planned to be removed than the previous plan by relocating the basins within the road.  There will be additional inlets along the road to capture stormwater and direct it into the basins.  The township would also need grading easements from some of the residents along with the HOA.  These grading easements would permit the township to move the swale back into the Township right-of-way, as it is believed that the swales have moved into some of the yards due to the location of the trees.  The preliminary design has a short landscape wall in two locations to help with grading, there is also a proposed 8” concrete curb between Lambeth and Chapel Courts.

20180126 Hawthorne Drive – Preliminary Plan