November 2023 – HHA Newsletter

2023 End of Season – Pool Schedule

The pool will be closed during the weekdays of Monday August 28 through Friday September 1.

The pool will reopen for the final 3-day Labor Day weekend: Saturday September 2 through Monday September 4. 

The pool will then be closed for the season, reopening Memorial Day weekend of 2024.

Thank you.

Pool Likely Opening Late Today – Wednesday August 24

Due to lifeguard availability, the pool is likely opening late today. We will edit this post once the schedule is confirmed for today. Thank you.

Pool Closing 10 Minutes Early Tonight – Sunday August 20

The pool will be closing at 7:20pm tonight – Sunday August 20. Thank you.

Pool Opening Late Today – Saturday Aug 19

The pool will be opening at approximately 12:30pm rather than 12:00pm Noon today – Saturday August 19. Thank you.

PECO Power Outages and Pool Availability

PECO has announced planned power outages for today – Thursday, August 17 between 8:00am and 4:00pm.

If the power outages impact the pool area, we expect that the pool area will be closed. We can anticipate that an extended power outage that impacts the pool area may require the pool to be closed beyond the power outage, as the water quality will need to return to normal before the pool may be reopened. Thank you.

HHA Neighborhood Updates

The Canterbury CT paving project is complete – the road will reopen for traffic at 9:00am tomorrow – Thursday August 3. Per the HHA Reserve Study – Glouchester CT is the next road to be resurfaced, tentatively scheduled for Summer 2024. See the New Paving Do’s and Don’ts below.

The Baby Pool had reopened last Friday July 28 after a brief mechanical outage.

The Gaga Ball Pit has officially opened. See the recent newsletter for details.


ROADWAY “DO’s and DON’Ts”

FOLLOWING THE CANTERBURY CT PAVING PROJECT

DO make sure the vehicle’s wheels are rolling before turning the steering wheel

DON’T turn your automobile wheels while the vehicle is at a complete stop

DON’T drive on the roadway edges, the edges may crack and crumble

DON’T drive aggressively, fast starts and stops will cause damage

DON’T spin your wheels, turn sharp, or stop short

Thursday July 27 – Pool Update – Baby Pool Closed

The Baby Pool is closed until further notice due to a mechanical issue with the pump. The Big Pool remains open.

July 2023 – HHA Newsletter

Canterbury CT Paving Project – Week of July 31

The HOA Board has awarded a Canterbury CT repair & resurfacing bid to JENA Asphalt Solutions. The work will begin the week of Monday July 31.

Anticipated timeline:

  • Monday July 31 – stage equipment, residents relocate vehicles to Hawthorne Drive (outer-loop only)
  • Tuesday Aug 1 – mill & repair – Road closes. Trash/Recycling service will be accommodated
  • Wednesday Aug 2 – pave/overlay
  • Thursday Aug 3Road reopens

Residents will receive more specific instructions via flyers delivered to their households before, during, and after the project.